ZTE type damping spring vibration isolator, the height can be adjusted according to actual needs. Easy to install, anti-skid rubber secondary vibration-absorbing pads are installed on the upper and lower parts.
The appearance is light and strong, and it is suitable for various types of mechanical internal vibration isolation devices. The springs are processed by heat treatment, electrophoresis, baking and other procedures. The anti-slip rubber at the bottom has high safety performance, is easy to control and adjust the level, can effectively eliminate floor vibration, and the price is relatively economical.
The product adopts ductile iron shell and has long service life.
After strict testing before leaving the factory, the quality is strong and durable.
Multiple plastic spraying and baking process, corrosion-resistant, suitable for use in various environments
Damping spring vibration isolators Installation Instructions
Before installing the damping spring vibration isolator, please confirm whether the model and specification of the vibration isolator are correct. The compression amount of the vibration isolator is generally between 10-25mm. After the vibration isolator is placed in the correct position, the fixing bolts need to be removed first, and then the fixed feet of the equipment are installed on the vibration isolator and fixed. First, fix the vibration isolator with foundation bolts, and adjust the height of the vibration isolator to balance the equipment. Then adjust the nut clockwise upward and counterclockwise downward. After the balance is adjusted, finally connect the pipeline.
If the connecting pipe next to the machine or water tower increases the load of the vibration isolator due to the addition of suspended pipes, additional pipes must be installed to avoid insufficient load on the shock absorber.
product structure diagram
Commodity parameters
model |
load capacity(KG) |
H |
Below length |
Bottom hole spacing |
width |
Upper length |
Upper hole spacing |
weight |
ZTE-1 |
5-15 |
140 |
160 |
140 |
78 |
100 |
12 |
3.3 |
ZTE-2 |
15-30 |
140 |
160 |
140 |
78 |
100 |
12 |
3.3 |
ZTE-3 |
30-50 |
140 |
160 |
140 |
78 |
100 |
12 |
3.3 |
ZTE-4 |
50-80 |
140 |
160 |
140 |
78 |
100 |
12 |
3.3 |
ZTE-5 |
80-120 |
140 |
160 |
140 |
78 |
100 |
12 |
3.4 |
ZTE-6 |
120-180 |
140 |
160 |
140 |
78 |
110 |
12 |
3.5 |
ZTE-7 |
180-230 |
140 |
160 |
140 |
78 |
110 |
12 |
3.5 |
ZTE-8 |
230-320 |
160 |
225 |
190 |
93 |
168 |
14 |
7 |
ZTE-9 |
320-500 |
160 |
225 |
190 |
93 |
168 |
14 |
7 |
ZTE-10 |
500-700 |
160 |
225 |
190 |
93 |
168 |
14 |
7 |
ZTE-11 |
700-1000 |
180 |
225 |
190 |
93 |
168 |
14 |
7 |
ZTE-12 |
1000-1400 |
180 |
225 |
190 |
93 |
168 |
14 |
7 |
Applicable equipment
chillers,cooling water towers,floor fans or floor air conditioning boxes,etc.
The company has various specifications and styles of vibration isolators. Welcome to consult!
FAQ
Q1. Are you manufacturer or trade company ?
We are professional manufacturer in China , and have in this line almost 10 years .
Q2. Would it be possible for us to visit your factory ?
Sure, welcome you at any time !
Q3 .How can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment
Q4. Will your company supply samples ?
Yes ,we do .
Q5.How can we get the quotation ?
Please inform us in which industry, equipment, size and weight.
Q6.what's the lead time ?
Usually is 5-15 days after we received your payment .
Q7 . what is the packaging ?
Inner packing -poly bags .Outer packing -Export cartons .
Q8. Can I get your products with our logo and design ?
Yes ,you can . Most of our products can be customized according to your requirements .
Q9. Which payment terms are you accept ?
T/T , L/C .Western Union , Money gram are available for us . we accept 30% T/T in advance , the balance should be paid before
shipping .